Pfizer works on expanding its packaging department in Puurs. This department comprises of 16 packaging lines for sterile medication, but will evolve to 32 lines. With Sweco Belgium as a partner, Pfizer is given a combination of services for both the design of clean room packaging lines, the engineering of industrial building installations and the design of an architecturally stunning building to guide this large-scale order.
Client:Pfizer
Location: Puurs
Period: 2013
Duration: 18 months
Phases: Basic Engineering, Detailed Engineering, Procurement and Construction Management