Skip to content

Measurement campaign at ArcelorMittal Genk

ArcelorMittal engaged Sweco Belgium for a comprehensive measurement campaign on the cooling circuits and cooling towers as well as for the development of the corresponding optimal control strategy of these installations.

Client
ArcelorMittal
Location
Genk
Period
2016

Investigating Energy Savings Through Refrigeration Plant Renovation

The specific request was to investigate the possible energy savings that would bring about a major renovation of the refrigeration plants. To this end, Sweco conducted a measurement campaign that gathered information about both electrical and thermal capacity. We also proposed an optimal control strategy that combines high operational exploitation security with minimal energy consumption.

Testimonial

As a result of Sweco’s professional hands-on approach during the measurement campaign involving internal production and maintenance services, Sweco has developed a tailor-made control strategy that clearly ensures savings and helps us in ensuring the reliability of the installation.

How can we help you?

How can we help your business? A team of experts is ready to assist you and see how we can help with your inquiry. When you submit this form, someone from our team will get in touch with you. This form is intended solely for more information about our Sweco business solutions.
  • This field is for validation purposes and should be left unchanged.
  • Drop files here or
    Max. file size: 50 MB.
      You may withdraw your consent at any time via the unsubscribe link in our emails.