Aquafin is building two CO₂-neutral sludge dryers in Beringen and Roeselare. The residual heat from Biostoom Beringen and the intermunicipal organization Mirom will be used to dry the sludge from wastewater treatment plants (WWTPs).

Expertise:
High-performance buildings, Industrial solutions, Water
Klant
Aquafin
Locatie
Beringen and Roeselare
Services
environmental permit (Sweco Loket), HAZOP (Hazard and Operability Analysis), architectural design, structural stability, and building systems
Partners
Stadsbader and Huber

Together with Aquafin, Stadsbader, and Huber, Sweco has been responsible for the design and preparation of the environmental permit for both sludge dryers. We also contributed to the HAZOP (Hazard and Operability Analysis) to ensure maximum integration of safety aspects into the concept. Currently, we are working on the architectural design, structural stability, and building systems.

This project is a crucial step in Aquafin’s ambition to make wastewater sludge processing more efficient and sustainable. The two new facilities are expected to be operational by 2026, replacing three outdated sludge dryers in Deurne, Leuven, and Houthalen. With an investment value of over €110 million, this project plays a key role in achieving Aquafin’s goal of eliminating fossil fuels from the sludge treatment process.

Aquafin is begonnen met de bouw van twee CO₂-neutrale slibdrogers in Beringen en Roeselare.

Dried sludge valorized as fuel

With the construction of new sludge dryers, Aquafin is taking a significant step toward a CO₂-neutral future. These innovative facilities combine advanced technology, sustainable energy sources, and residual heat, setting a new standard for sludge treatment and contributing to the circular economy. The dried sludge does not end up as waste but is valorized as fuel in a planned mono-processing facility. Here, it will be used to generate high-pressure steam for industrial processes, making sludge treatment both more sustainable and circular. The locations in Beringen and Roeselare have been strategically chosen to ensure efficient sludge transport and minimize transport distances.

Design & Build follows successful permit process | Sweco-Loket

 

The project was launched through a design-and-build procedure, with the Stadsbader-Deckx-Sweco-Huber team selected as the best bidder. After a complex permitting process, the permits for the Beringen and Roeselare sites were granted in June and August 2024, respectively. During the permitting phase, Sweco was responsible for the architectural, structural, and process design. In the execution phase, our teams are handling the detailed engineering of architecture, structural stability, and building systems, while also coordinating with Deckx and Huber, who are carrying out the detailed process engineering. At both sites, construction has now started with the installation of pile foundations and retaining walls for the deeply excavated sludge bunker.

How can we help you?

How can we help your business? A team of experts is ready to assist you and see how we can help with your inquiry. When you submit this form, someone from our team will get in touch with you. This form is intended solely for more information about our Sweco business solutions.
  • This field is for validation purposes and should be left unchanged.
  • Drop files here or
    Max. file size: 50 MB.
      You may withdraw your consent at any time via the unsubscribe link in our emails.