Client

ArcelorMittal Gent

Location

Ghent

Period

2014

Duration

(detailed until start up): 12 months

Engineering hours

15.000

Phases

preliminary design, design

Construction ladle furnace to meet the demand for better, stronger types of steel with a low sulphur content.

Our approach

Brownfield

  • Integration on one of the four ladle-metallurgy lines
  • Turn key : electro-mechanical part
  • Adaptation of the existing and additional infrastructure around the installation
  • Engineering new utilities
  • Modification existing pipework and cables
  • Adjusting furnace mode, steel ladles, steel carts and the maintenance modes for the ladles.

Greenfield

  • New filter instalation (turn key) and a complete cooling system
  • Construction new warehouse, pump room, cooling tower, piping bridge, substation, ultramodern control room.
  • Lay-out study
  • Concepts and specifications of the necessary equipment

Specific approach

  • Project approach: EPCm
  • Procurement: responsible for the orders during construction

Disciplines

  • Project management
  • Procurement
  • Process
  • Mechanical & civil engineering
  • Equipment
  • E&I
  • Piping
  • Construction management

Company profile
ArcelorMittal is a steelworks located in the canal zone of Ghent. This giant manufactures steel from ore in several intermediate stages and with the automotive manufactures being a major source of custom.