Client

INEOS Phenol

Location

Beveren

Period

2017 – …

INEOS Phenol requested Sweco to look into some specific savings measures in the context of EBOs (Energy Policy Agreements).

Sweco conducted annual simulations based on historical data to identify potential savings measures on steam boilers, cooling circuits and cooling towers. We then examined the technical and economic feasibility of these measures.

After an internal brainstorming session on energy-saving measures, the feasibility of a number of measures had to be considered in the short term. Sweco responded quickly to assist us in this matter. Only limited information was available. Following some very specific questions and based on Sweco’s experience, we were able to complete a well-founded feasibility study for a number of measures within a limited period of time. The required documents were delivered within the required period.”