Skip to content
Sweco ondersteunt NMBS bij toezicht en kwaliteitscontrole op stationsprojecten

30/10/2026

Reading time: 3min

Sweco Belgium

Sweco supports NMBS-SNCB with site supervision and quality control on station projects

Under a new framework agreement, NMBS-SNCB is engaging Sweco to provide supervision and quality control for infrastructure works, construction works in station buildings and various technical installations. The assignment comprises three geographical lots, covering station projects throughout Belgium.

NMBS-SNCB is upgrading its stations to improve the passenger experience and prepare its infrastructure and station buildings for an expanding rail service. The framework agreement gives the railway company the flexibility to bring in additional capacity and specialist expertise for individual projects. It runs for five years, with each call-off assignment covering the actual construction period of the site concerned.

“This framework agreement provides a strong foundation for supporting NMBS-SNCB with our multidisciplinary expertise. Through close collaboration and careful monitoring, we can respond flexibly to the needs of a wide range of station projects.”

Erwin Malcorps, Business Area President, Sweco bv/srl

Sweco ondersteunt NMBS bij toezicht en kwaliteitscontrole op stationsprojecten

NMBS-SNCB invests in multimodal stations

As Belgium’s national railway company, NMBS-SNCB is responsible for welcoming passengers and managing, maintaining and upgrading its stations. These are increasingly becoming accessible, comfortable and multimodal hubs, offering seamless connections between trains, bicycles, cars and other modes of transport.

An integrated approach to site supervision

Sweco’s experts will inspect buildings and technical structures and prepare the associated technical documentation. They will monitor progress and safety, maintaining a continuous presence during critical, exceptional or high-risk activities. For works in the immediate vicinity of railway tracks, they will take specific safety and training requirements into account.

Sweco will also coordinate the parties involved and document site arrangements. The teams will check technical quality, from contractors’ drawings to materials and workmanship, and manage financial and administrative follow-up, paying particular attention to changes and construction schedules.

Monitoring station works

Sweco will monitor each assigned site from the start of construction through to handover. We will inspect the completed works, check as-built documentation and operation and maintenance manuals, assess the required acceptance tests and verify the final account. This will provide NMBS-SNCB with a substantiated assessment of the quality delivered and any issues requiring attention for each call-off assignment.

Sweco ondersteunt NMBS bij toezicht en kwaliteitscontrole op stationsprojecten

Photos: © Adobe Stock

Other news

Expert Talk, Liveable cities, Circular Economy29/10/2026

Portfolio management: existing buildings as a lever for liveable cities

Read more

Low-impact Buildings, Low-impact Buildings, Expert Talk27/10/2026

Xenon at Park 7 achieves WELL Platinum certification: when a building actively supports health and well-being

Read more

Sign up for our newsletter

Receive updates on groundbreaking projects, sustainable solutions, and exclusive insights from Sweco. Subscribe now and be part of the future transformation.
  • This field is for validation purposes and should be left unchanged.
    You may withdraw your consent at any time via the unsubscribe link in our emails.