Project support for Total OPTARA

Building new installation: conversion vacuum residu into high-value products. Transport remaining vacuum gas oil to Zeeland Refinery. Large impact on refinery infrastructure (Project Lot 5) and existing utilities (Project ELEKTRA).

Client
Total Energies
Location
Antwerp
Period
2013 – 2014

Scope Sweco Belgium

  • Design temporary site facility (6ha) for project teams and contractors of Optara and ROG project
  • Design Road G for extreme heavy transport (max. 1500 ton) incl. 2 bridges over piping ditches
  • Design lay down area at TPA Several supporting subprojects

Challenge

  • Extreme heavy and large modules: stability of the underground (very poor soil quality)
  • Very time critical execution of subscopes

Project approach

  • Underground utilities, new HV/LV power distribution cabinets, asphalting (1)
  • Design new internal road and two bridges (2)
  • 3D scanning of buildings and piping for transport simulation (2)
  • Repositioning electrical panels and piping (2)
  • Provide laydown area at TPA inclusive the utilities (3)

Disciplines

  • E/I & piping
  • Civil Engineering & stability
  • Procurement
  • Construction & project management

Company profile

Total Raffinaderij Antwerpen (TRA), in the port of Antwerp, is the second biggest, most complex refinery of the Total Group and the third biggest refinery in Europe. TRA is an important link in the integrated petrochemical complex of Total in Belgium. Large oil tankers unload crude oil at the terminal in Rotterdam. This oil is transferred through a pipeline to Antwerp in order to be converted in the refinery into high-value products such as petrol, diesel and kerosene for both the European and American markets, and into base products such as naphtha, butane and aromatics for the petro-chemicals industry.

Photo: © Total

How can we help you?

How can we help your business? A team of experts is ready to assist you and see how we can help with your inquiry. When you submit this form, someone from our team will get in touch with you. This form is intended solely for more information about our Sweco business solutions.
  • Drop files here or
    Max. file size: 50 MB.
      You may withdraw your consent at any time via the unsubscribe link in our emails.