Future-proof warehouse logistics for Alpro in Wevelgem
How can you accommodate growth when storage space at a production site is under pressure? For Alpro in Wevelgem, Sweco developed an integrated logistics solution combining an automated high-bay warehouse with a conventional warehouse. This keeps finished products close to production while ensuring efficient flows of packaging materials.
- Client
- Alpro
- Location
- Wevelgem, Belgium
- Sweco scope
- Logistics concept engineering, civil and technical engineering, general contracting
A logistics concept as the starting point
The anticipated growth at Alpro’s production site in Wevelgem raised a strategic question: should all finished products be stored on-site, or should part of the storage capacity be located externally?
Sweco assessed the feasibility and developed a logistics concept that optimally aligns storage capacity, internal material flows and production. The solution establishes a direct connection between the warehouse and production, allowing products to move efficiently from the production lines to storage and dispatch.

Automated storage for complex material flows
The solution combines an automated high-bay warehouse with a conventional warehouse for packaging materials. The high-bay warehouse provides capacity for 29,500 pallets and reaches a height of 40 metres.
Nine multi-carrier ASRS pallet cranes handle automated pallet storage and retrieval. Temperature control across different regimes ensures that products are stored under the appropriate conditions. This enables a reliable and efficient logistics flow tailored to the requirements of production.
Key figures
- 10,500 m² of floor space
- 40 metres building height
- 29,500 pallet positions
- 9 multi-carrier ASRS pallet cranes
- Temperature control across different regimes
- Direct connection between warehouse and production
- Conventional warehouse for packaging materials
From logistics analysis to project delivery
Sweco provided comprehensive support throughout the project, from logistics analysis and concept engineering to civil engineering, technical utilities and general contracting.
By approaching the building, technical installations and logistics automation as one integrated system, Sweco delivered a solution that meets both the requirements of the existing site and Alpro’s future ambitions.

A scalable foundation for future growth
The new warehouse infrastructure increases Alpro’s on-site storage capacity. The direct connection to production reduces internal movements and supports a smooth flow of goods.
As a result, Alpro benefits from a future-proof logistics infrastructure that combines efficiency, reliability and the capacity for further growth.