Two steel bridges connect Wijnegem and create more room for inland shipping

Two separate bridges in Wijnegem replace the former ‘banana bridge’ over the Albert Canal, completing the programme to raise 62 canal bridges. They provide a safe crossing for cyclists and pedestrians, a new road connection and more room for shipping. As part of the Arcadis–Sweco joint venture, we combined steel engineering with mobility consultancy and support through to construction to help deliver this transformation.

Expertise:
Transport & Mobility
Client
De Vlaamse Waterweg nv
Location
Albert Canal, Wijnegem
Services
Mobility consultancy, traffic disruption mitigation and traffic simulations, modelling and structural analysis of the steel road bridge, drainage design, permit applications, tender support and construction supervision
Partners
Arcadis, ZJA

From one shared bridge to two dedicated connections

Replacing the iconic banana bridge was about more than infrastructure alone. It created an opportunity to redesign the canal surroundings and better tailor the connection between the two banks to different users. The new road bridge has been in use since June 2024. With the opening of the separate cycle and pedestrian bridge in 2026, active mobility also gained a dedicated place in the renewed canal area.

A four-metre-wide cycle path and a three-metre-wide footpath give each user their own space. The gentle 4% gradient and rest platforms along the route make the crossing more comfortable and accessible for schoolchildren, commuters, walkers and leisure cyclists.

Integrated engineering, from traffic flows to steel structures

Commissioned by De Vlaamse Waterweg nv, the Arcadis–Sweco joint venture worked with ZJA on the architectural design. Sweco took on a broad role within this collaboration. For the road bridge, we delivered the mobility studies, including traffic simulations and a strategy to minimise disruption, as well as the modelling and structural analysis of the slender steel bridge structure. Our scope also covered the drainage system, permit applications, support with the tender documentation and construction supervision.

This brought traffic engineering, structural design and construction considerations together in one approach. The steel engineering also received external recognition: in January 2026, the road bridge was nominated for the BENELUX Steel Bridge Contest, which showcases outstanding steel and composite steel–concrete bridges.

Wijnegem omarmt zijn nieuwe fietsverbinding over het Albertkanaal

Two bridge types, one ensemble in white steel

Both bridges are built in white steel, yet each has its own structural character. The road bridge is an understated, robust arch bridge. The 175-metre-long cycle and pedestrian bridge has a slender, asymmetrical cable-stayed structure. A long, largely freestanding approach ramp on V-shaped columns leads to the crossing, with a support on a projection of the lock complex. Together, these two different bridge types form a coherent ensemble in the canal landscape.

The cycle and pedestrian bridge brings structure and use together: a raised bridge girder separates the cycle path from the footpath and provides seating overlooking the water and locks. Transparent balustrades preserve open views. The design also accommodates future developments: the abutment is deliberately set back from the canal, leaving room for a future expansion of the lock complex.

Twee stalen bruggen verbinden Wijnegem en geven de binnenvaart ruimte

Completing the Albert Canal upgrade

The renewal in Wijnegem is part of the large-scale upgrade of the Albert Canal. A clear navigation height of 9.10 metres allows inland vessels carrying four layers of containers to use the waterway. The demolition of the old banana bridge and the construction of the two new connections completed the programme to raise a total of 62 bridges.

This intervention strengthens a waterway that carries around 40 million tonnes of goods each year, equivalent to roughly two million trucks. In Wijnegem, this additional room for inland shipping goes hand in hand with safer local connections.

A renewed canal environment for Wijnegem

The area around the bridges is also part of the transformation. Connections to the canalside infrastructure and green landscaping of former construction sites and the assembly area integrate the new infrastructure into its surroundings. Wijnegem gains not only two new crossings, but also a more attractive canal area where shipping and local mobility each have their place.

Twee stalen bruggen verbinden Wijnegem en geven de binnenvaart ruimte

How can we help you?

How can we help your business? A team of experts is ready to assist you and see how we can help with your inquiry. When you submit this form, someone from our team will get in touch with you. This form is intended solely for more information about our Sweco business solutions.
  • This field is for validation purposes and should be left unchanged.
  • Drop files here or
    Max. file size: 50 MB.
      You may withdraw your consent at any time via the unsubscribe link in our emails.